Replacement Boiler and Hot Water Cylinder

Before

  • Old Cast Iron Boiler 70% efficient​
  • Hot Water Cylinder Connected With Plastic Pipes​
  • Untidy Copper Pipework and System Controls​
  • Sludge and Ironoxide Removed During Chemical Power Flush​

After

  • New Mains Hot Water Cylinder
  • Manufacturers Registered
  • 7 Year Warranty
  • 25 Year Warranty
  • Annual Servicing
  • Gas Safe Registered
  • New Controls
  • Boiler Filter
  • Power Flush
  • New Boiler